Outdoor Living Space in Utah
The decisions that have to be made before the patio goes down are not the ones people expect.
- Utah contractor license 10726295-5501
- Over 20 years in business
- Parade of Homes People’s Choice
- 4.8 from 45 Google reviews
- Free estimates, no obligation
- Based in Lindon, Utah
Outdoor living space Utah County projects do not usually go wrong on the patio. They go wrong on the things that were supposed to run underneath it.
A yard built one element at a time ends up with an extension cord across the lawn, a propane bottle beside a built-in grill, and a hot tub in the only place a crane could reach. None of that is a workmanship problem. It is a sequencing problem, and it is decided in about an hour, months before anybody lays a paver.
The things you cannot add later
Here is the entire argument of this page in one table. The left column is cheap while there is an open trench in the yard. The right column is what the same thing takes once the surface is finished.
| What | Goes in before the hardscape | Adding it later |
|---|---|---|
| Natural gas line | A buried line to the grill, the fire feature or a heater | Cut the patio, trench, repair. The repair rarely matches |
| Power at the patio | Conduit out from the house for outlets | Surface conduit on the wall, or lift hardscape |
| Lighting runs | Low-voltage cable routed before the base goes down | Visible cable, or routed the long way round the beds |
| Hot tub feed | A heavier circuit and a solid, level pad | A new trench, and often a new pad in a worse spot |
| Water line | A line for a sink, a bar or a water feature | Same cut and repair as gas, plus a second trade |
| Drain lines | Pipe carrying roof and surface water past the patio | Water finds the problem first. Then you lift the patio |
| Structure footings | Footings sized and placed for a future cover | Cut out pavers or core the slab to reach bearing |
| A spare empty sleeve | Conduit with a pull string and no job yet | The thing you wish you had. Costs almost nothing now |
The useful way to think about it: everything above the surface can wait, and almost nothing below it can. A pergola added in three years is a normal job. An outlet added in three years is a compromise. The budget decision people agonize over, which structure to build, is the reversible one. The decision they make casually, whether to run a line out there, is the one that locks in.
Spare sleeves are the cheapest insurance in the yard
A sleeve is a length of empty conduit with a pull string in it, buried across the area before anything is built on top. On the day it goes in it does nothing at all. That is the point.
Four years later, somebody wants a second lighting zone, or a pump for a water feature, or power at the far end for a shed, or a tub where the pad already happens to be. With a sleeve in the ground that is an afternoon. Without one it is a conversation about cutting the patio.
While the trench is open the cost of adding one is close to nothing, which makes it the best value item in a project like this by a wide margin. We put them in as a matter of course and we mark where the ends are, because a sleeve nobody can find is the same as no sleeve.
One trench, several trades
The reason this all has to be decided at once is that it all happens in the same week.
The ground gets opened, the drainage goes in, the gas and electrical runs and the sleeves go in alongside, the licensed trades make their connections and get their work inspected, and then the trench is closed, compacted and the base goes in on top. After that the yard is a finished surface and the window has shut.
To be straight about who does what: we build the hardscape, we dig, and we set the sleeves and the lines in the right places at the right depths for the trades. A licensed electrician and a licensed plumber make the gas and electrical connections and pull their own permits for that work. We are not going to claim that part is us. What we are responsible for is that the trench is open when they need it and that nothing has to be dug twice.
Compaction over a backfilled service trench is the part that gets skipped by people in a hurry, and it shows up two winters later as a dip in the patio following the exact line of the pipe. Base and compaction are covered properly on hardscaping.
Where each zone goes, and the mistakes that repeat
Four zones is the practical maximum, and plenty of yards that work beautifully have two. The placement matters more than the count.
| Zone | Where it belongs | Why |
|---|---|---|
| Cooking | Close to the kitchen door | Carrying food across a yard gets old in one summer |
| Dining | Next to cooking, out of the smoke | Check which way the afternoon wind runs first |
| Sitting | Off the main route between house and yard | A path through a seating group ruins it |
| Fire | Away from the house and away from the table | Clearances decide this, not the view |
Three things go wrong often enough to be worth naming.
- The kitchen at the far end of the garden. It photographs well and it gets used for one summer. Everything you cook with starts in the indoor kitchen, so the distance is paid twice per meal, every time.
- The fire feature next to the dining table. They are used at different points in an evening, they want different seating, and together neither one works. Keep them apart and you get two usable areas instead of one crowded one. Clearances decide the rest, and those are on fire pit installation.
- The main path running through the seating. If the route from the back door to the lawn crosses where people sit, the seating never settles. Move the route to the edge before anything is built, because later it is the paving that would have to move.
Which way the afternoon wind runs is worth ten minutes of attention before the layout is fixed. It decides where smoke goes, and it is the one thing on this list you cannot change later at any price.
Shade belongs over the zone you use at the worst hour
Shade is the element that gets under-built, and the reason is usually that it is decided last and by then it is the thing the budget takes out.
The layout question, as distinct from the structure question, is simply which zone gets it. In Utah County the answer is almost always the dining area, because the hours people actually want to be outside eating are the same hours the afternoon sun is on the back of the house. A beautifully shaded seating corner next to a dining table in full sun is a common and expensive way to get this backwards.
What to build over it is a separate decision with real cost consequences. Open structure or solid roof is on covered patios and pergolas, and the numbers are on pergola cost.
Where the money actually goes
Outdoor living space Utah County budgets are dominated by two line items: the hard surface, and whatever goes over it. Those are the two worth comparing carefully.
The buried services, which is everything this page has been arguing for, are a small fraction of the total while the ground is open. That ratio is the entire reason to do them now. The same work after the fact is not a small fraction of anything, because you are paying to undo and redo finished work in order to get at it.
Per-element numbers are published on the cost pages: pergolas, composite decks, retaining walls, fencing and sprinkler systems. Whole-project ranges are on landscape design cost.
If the budget only covers part of it
This comes up on most projects and the answer is consistent enough that it is worth stating plainly.
Build everything below the surface to its full extent, build the hardscape to its full extent, and defer everything that sits on top. Drainage, gas, conduit, sleeves, footings and base, all of it, across the whole area you eventually intend to use. Then the patio. Then stop.
The structure, the kitchen, the fixtures, the furniture and the planting can all arrive later without anybody disturbing what is already built. Deferring those costs you time and nothing else. Deferring the buried work costs you the patio, twice.
The one thing we would not do is shrink the hardscape to afford a structure this year. A patio built undersized is the most common regret we hear, and extending one later means a visible joint, a second delivery of material that may not match, and paying twice for the same setup.
Where we build
Utah County and the north end of the Wasatch Front.
The design process itself, and phasing a yard across two seasons, is on backyard landscape design. Surfaces are on hardscaping and paver patios. If the ground slopes or holds water, start with steep slope landscaping or grading and drainage, because both change what is possible before any of this is drawn.
Outdoor living space Utah FAQs
What customers say
4.8 stars from 45 reviews on Google. Three of them, dated, so you can see they are current.
“They recently fully landscaped my home and included a fire pit and an in-ground tramp.”
“We love our deck and patio. Andreas and his team were very meticulous in making sure everything was perfect and exceeded our expectations! High quality workmanship”
“The absolute best! We needed a complete backyard redo and new exterior of our house.”
Recent work
Projects built by our own crews across Utah County and the Wasatch Front.
New projects go up here first.
What counts as an outdoor living space?
A yard where the hard surfaces, the shade, the heat and the services were planned as one thing rather than added one at a time. In practice that is some combination of a patio or deck, something overhead, somewhere to cook, somewhere to sit and a fire feature, with the gas, power and drainage already run to each of them.
What has to go in before the patio is laid?
Anything that lives under it. Gas, electrical conduit, low-voltage cable, water, drain lines and the footings for any future structure. Those are the irreversible decisions. Furniture, fixtures, planting and even the structure itself can follow later without disturbing anything.
Can I add a gas line to the patio later?
Yes, and it means cutting the surface, trenching and repairing. On pavers the repair is better than most people expect because units lift and reset, which is one of the real advantages of pavers. On poured concrete the repair is a visible patch for the life of the slab.
Can I add outlets later?
Usually, but the route gets ugly. Once the hardscape is down the realistic options are surface conduit run along the house wall or a path around the outside of the beds. Neither is what you would have chosen with an open trench in front of you.
What is a sleeve, and why do you keep mentioning them?
An empty length of conduit with a pull string in it, buried across the area before anything is built on top. It has no job on the day it goes in. It is there so that in four years a cable or a line can be pulled through without touching the patio. While the trench is open it is close to free, and it is the single best value item in a project like this.
Do I have to decide about a hot tub now?
You have to decide whether one is possible, which is not the same thing. A tub needs a heavier electrical feed and a flat, solid, properly supported pad in a spot that makes sense. Leaving a suitable pad and a sleeve to it costs very little. Retrofitting both later usually means the tub ends up wherever it can go rather than where you want it.
Who actually does the gas and electrical work?
Licensed trades. We build the hardscape, dig the trench and set the sleeves, and a licensed electrician and a licensed plumber make the connections and pull their own permits for that work. We are not going to tell you we do that part ourselves.
Should the grill go near the house or out in the yard?
Near the kitchen door, almost always. An outdoor kitchen at the far end of the garden gets used enthusiastically for one summer and then sits there. The exception is wind: if the prevailing afternoon breeze puts smoke straight into the dining area or the back door, it moves.
Where should the fire feature go relative to the dining table?
Not next to it. They are used at different points in an evening and they want different seating, so putting them together means neither works properly. Clearance from the house and from anything combustible decides the rest, and that is covered on fire pit installation.
How many zones does a yard actually need?
Fewer than most plans show. Four is the practical maximum: cooking, dining, sitting, fire. Plenty of excellent yards have two. A yard chopped into five small areas reads as cluttered and none of the areas ends up big enough to use.
If I can only afford part of it, what should I build first?
Everything that goes under the surface, at full extent, plus the hardscape. Defer the things that sit on top: the structure, the kitchen, the fixtures, the furniture. Deferring what is above ground costs you nothing but time. Deferring what is below ground costs you the patio.
What happens to the footings if I add a cover later?
If they were placed and sized at the start, nothing. The posts land on them and the work is clean. If they were not, the footings have to be formed through the finished surface, which means cutting out pavers or coring the slab to reach bearing. Marking footing positions costs nothing on the day the base is being built.
Decide the buried work once
We will walk the yard, mark the zones and tell you what has to go in before anything is laid. Free site visit.