
Composite Deck Cost in Utah
Square foot pricing, the code threshold that quietly adds thousands, and what composite really saves against wood here.
- Utah contractor license 10726295-5501
- Over 20 years in business
- Parade of Homes People’s Choice
- 4.8 from 45 Google reviews
- Free estimates, no obligation
- Based in Lindon, Utah
Composite deck cost Utah County starts at about $50 a square foot installed, and the thing that moves it is almost never the decking you choose.
It is how high the deck sits, whether it needs stairs, and what shape it is. One of those three is a code threshold you can sometimes design your way under, and almost nobody checks.
What a composite deck costs by size
| Size | Deck area | Installed | What it fits |
|---|---|---|---|
| 12 x 12 | 144 sq ft | from $7,200 | A grill and a small table |
| 12 x 16 | 192 sq ft | from $9,600 | Table for six, the common size |
| 16 x 20 | 320 sq ft | from $16,000 | Dining and seating separated |
| 20 x 24 | 480 sq ft | from $24,000 | A full outdoor room, usually with stairs |
These start from the ground-level figure. A deck sitting low, square, with no stairs, is as cheap as a deck gets. Add height, add a flight of stairs, add an angle, and each one costs real money for reasons that have nothing to do with the boards.
Thirty inches is the line
This is the single most useful thing on this page.
The residential code requires a guard on any deck surface more than 30 inches above grade, and that guard must be 36 inches high, with openings no 4 inch sphere can pass through. At 30 inches and below you need none at all.
On a 16 by 20 deck that is roughly fifty linear feet of railing you either have to build or do not. Railing is one of the most expensive parts of a deck per foot, because it is posts, rails, infill and a lot of connections rather than a flat surface.
So ask the question before the design is settled. Plenty of decks end up at 32 or 34 inches for no reason other than that nobody checked the number. If the door height allows it, dropping to 29 inches and adding one step down can take thousands out of the project. Sometimes the house makes it impossible, and that is a perfectly good answer. It should be a decision, not an accident.
Stairs are structure, not surface
A flight of stairs costs far more than the same square footage of deck, and the code is why. Maximum riser is 7 3/4 inches, minimum tread is 10 inches, minimum width is 36 inches, and the variation between the largest and smallest riser across the whole run cannot exceed 3/8 of an inch.
That last one is what makes stairs skilled work. Every riser in a flight has to be within three eighths of an inch of every other, which means the landing, the footing and the deck height all have to be right before the first cut. Four or more risers also brings in a handrail, set 34 to 38 inches above the nosings.
A taller deck needs a longer flight, so height does not add cost once. It adds it twice.
Composite against wood, honestly
Composite is more expensive on day one. Anyone telling you otherwise is selling something.
What you buy is the end of the maintenance cycle. No sanding, no staining, no sealing, for the life of the boards. In this climate that is worth more than it sounds. At 4,491 feet the UV is stronger than at sea level, and the freeze and thaw cycle that moves footings also works on every finish you put on timber. A stained wood deck in Utah County wants real attention every few years, and the deck that does not get it is the one that gets replaced early.
One of our customers put it better than we could, about a deck we replaced: she had a thirty year old deck that was falling apart, and what she wanted was not to do that again.
Two honest caveats. Composite gets hot in direct sun, darker boards more than lighter, which matters on a west-facing deck in July. And composite fades, particularly at this elevation, so the color you choose is the color at year one rather than year ten.
The ledger is where decks fail
Not the boards, not the posts. The connection to the house.
The code requires a deck to be positively anchored to the primary structure for both vertical and lateral loads, and every deck-to-dwelling connection to be weatherproof, with any cut in the exterior finish flashed. The code calls the ledger flashing especially critical, and it is right to: a ledger bolted on without proper flashing is a water path directly into the wall of your house, and the damage is invisible until it is expensive.
The other rule worth knowing, because it turns up constantly on plan checks, is that girders may not be supported on the ledger or the band joist. That is structural, not a technicality.
Footings go below the frost line, which Provo publishes as 30 inches. Higher up the bench it is deeper, so a deck in Alpine or Sundance is not footed to the same depth as one in Orem. Groundwork is covered on excavation and grading.
What else moves the number
- Shape. A rectangle is the cheapest deck there is. Angles, curves and wrap-arounds all add framing, cuts and waste.
- Railing choice. Once you are over 30 inches, what the guard is made of is a real line item. Composite, metal and cable are not close in price.
- Board grade. Composite spans a wide range depending on capping, warranty and finish, and the gap between entry and premium lines is significant.
- Access. As always. Whether material reaches the back yard or goes through a gate by hand.
- Lighting and built-ins. Far cheaper run while the frame is open than retrofitted later.
When the old frame can stay
Composite deck cost Utah County homeowners assume is the full build is sometimes a fraction of it, because the expensive half of a deck is underneath the part you walk on.
If the frame is sound, re-decking it with composite means new boards, new fasteners and new railing, with the footings, posts, beams and joists left alone. That can be a little over half the cost of a rebuild.
Whether yours qualifies comes down to three things, and we can tell you in one visit.
- Joist spacing. A frame built at 16 inch centers for timber will not always carry composite without extra blocking, particularly on a diagonal layout. That is work, but it is far less work than a new frame.
- Condition. Surface weathering on joists is normal and fine. Soft spots at the ledger, rot where the posts meet the ground, or rust on undersized hangers are not.
- The footings. If the original footings never went below the frost line, the frame has been moving every winter, and no amount of new decking fixes that.
We would rather tell you the frame is worth keeping and do the smaller job. A customer who got an honest answer on a $9,000 question tends to come back for the next one.
Where we build
Utah County and the north end of the Wasatch Front.
Decking as a service sits under pergolas and decking. Shade over a deck is pergola cost and covered patios. Whole-project budgets are on landscape design cost, and if you are weighing a deck against a patio surface, hardscaping covers the alternative.
Composite deck cost Utah FAQs
What customers say
4.8 stars from 45 reviews on Google. Three of them, dated, so you can see they are current.
“Andreas and his team did an amazing job on our back deck! We had a 30 year old deck that was falling apart and we are SO HAPPY with the new Trex deck!”
“We love our deck and patio. Andreas and his team were very meticulous in making sure everything was perfect and exceeded our expectations! High quality workmanship”
“Our backyard deck is amazing!”
Recent work
Projects built by our own crews across Utah County and the Wasatch Front.
New projects go up here first.
How much does a composite deck cost in Utah?
From about $50 per square foot, installed. A 12 by 16 deck, which is the size most people end up with, starts around $9,600. Height above grade, stairs and shape are what move it up from there.
Why does 30 inches matter so much?
Because it is the line in the code. A deck surface more than 30 inches above grade requires a guard, and that guard has to be 36 inches high. Below 30 inches you need none. On a 16 by 20 deck that is around 50 linear feet of railing you either do or do not have to build, and railing is one of the most expensive parts of a deck per foot.
So should I just build the deck lower?
If the door height allows it, yes, and it is worth asking the question before the design is settled. Plenty of decks end up at 32 or 34 inches for no reason other than nobody checked. Dropping to 29 and adding a single step can take thousands out of a project. Sometimes the house height makes it impossible, which is a fine answer, but it should be a decision rather than an accident.
What do stairs add?
More than people expect, because a stair is structure, not surface. The code sets a maximum riser of 7 3/4 inches and a minimum tread of 10 inches, with no more than 3/8 of an inch of variation across the whole run, so a tall deck needs a long flight. Four or more risers also triggers a handrail, set 34 to 38 inches above the nosings.
Is composite actually cheaper than wood?
Not up front, and anyone telling you otherwise is selling something. Composite costs more per square foot on day one. What it buys is no sanding, no staining and no sealing for the life of the boards, which in our climate is not a small saving of either money or weekends.
How hard is Utah weather on a deck?
Hard. At 4,491 feet the UV is stronger than at sea level, and the same freeze and thaw cycle that moves footings works on any finish you put on timber. A stained wood deck here wants attention every few years. That maintenance gap is the real argument for composite, rather than the up-front price.
Does composite get hot in the sun?
Yes, noticeably, and darker boards more than lighter ones. On a west-facing deck in a Utah County summer it is worth choosing a lighter color or planning shade over it rather than discovering the problem in July.
How deep do deck footings go?
Below the frost line. Provo publishes 30 inches, and anything meant to resist frost movement has to bear below it. Elevations higher up the bench are deeper, so a deck in Alpine or Sundance is not footed to the same depth as one in Orem.
What is the most common thing that goes wrong on a deck?
The ledger, where the deck meets the house. The code requires the deck to be positively anchored for both vertical and lateral loads, and the connection has to be weatherproofed with any cut in the exterior finish flashed. A ledger fixed without proper flashing is a water path straight into the wall, and the damage is invisible until it is expensive.
Can a girder sit on the ledger?
No. The code is explicit that girders may not be supported on deck ledgers or band joists. It is one of the more common corrections on a deck plan check, and it is a structural point rather than a technicality.
Do I need a permit for a deck in Utah County?
Usually, and more or less always once it is more than 30 inches up or attached to the house. The threshold varies by city, so we check the specific one before anything is ordered.
Can you replace the boards on my existing deck frame?
Sometimes, and it is much cheaper than a full rebuild when it works. It depends entirely on the frame: joist spacing, condition, and whether the footings are still sound. A frame built for 16 inch spacing will not always take composite without additional blocking. We will tell you honestly whether yours is worth keeping.
Check the height before you design it
Thirty inches is worth asking about. Free site visit, figure in writing.
Call or text
Based in
Lindon, Utah
Serving Utah County & the Wasatch Front
Utah license
10726295-5501






