A 3D landscape design rendering of a sunken fire pit patio with curved brick seat walls and a water feature, by Viking Construction and Landscaping
New Builds · Utah County & the Wasatch Front

New Construction Landscaping in Utah

4.8 from 45 reviewsRead them

Every lawn rebate in the region requires lawn you already have. On a bare lot that means none of them, and the window to plan around it closes when the sod truck arrives.

  • Over 20 years in business
  • Parade of Homes People’s Choice
  • 4.8 from 45 Google reviews
  • Free estimates, no obligation
  • Based in Lindon, Utah
3 of 3Rebates Need Existing Lawn
$1.00Draper New-Build Rate
30"Minimum Frost Depth
Sep 15Lehi Sod Deadline

On an established Utah lot you can be paid to take lawn out. On a brand-new lot you cannot, because every program in this region requires living, irrigated lawn to already be there. That single rule inverts most of the advice written about water-wise landscaping.

Most new construction landscaping Utah guidance is written for established yards and quietly assumes a rebate is available. This page covers what is actually true on a bare builder lot: which incentives you can and cannot claim, which district you are in and why that changes the answer, what your city requires before it will give you occupancy, and the order of operations that avoids paying for the same decision twice.

The Rebate Rule Nobody Mentions Until It Is Too Late

There are three incentive programs a Utah homeowner is likely to hear about, and all three are turf-removal programs. The wording is not ambiguous. The Central Utah Water Conservancy District, which covers Utah County, requires that you must have existing well-maintained, living lawn in the project area at initial site visit. The statewide Division of Water Resources program requires that the project area must be currently landscaped with a living, maintained lawn. The district's switch-to-drip incentive takes a different route to the same place: the areas being converted must have existing, operable, overhead spray irrigation already in the planting beds.

A lot that was a field eighteen months ago has no lawn and no irrigation in the beds. It qualifies for nothing.

ProgramRateWhat must already exist
CUWCD lawn replacement (Utah County)$3.00/ft²Well-maintained, living lawn at the site visit
Division of Water Resources (statewide)$2.00/ft²Living, maintained lawn in the project area
CUWCD switch to drip$1.00/ft²Operable overhead spray in existing beds
JVWCD new construction (Draper)$1.00/ft²Nothing, it pays to prevent lawn
Program requirements as published. Terms and rates change; confirm current eligibility for your address before relying on any of them.

Both lawn programs also require pre-approval and a site visit before any work begins, and projects started or completed before that approval are ineligible. On a new build, the builder's crew may be moving dirt on a schedule that has nothing to do with your application.

The perverse implication is worth stating plainly, because people do consider it: the only way to collect the $3.00 per square foot on a new lot is to install sod, keep it alive and well-maintained, have it inspected, and then pay to remove it. You would be buying a rebate with the cost of an install, a removal and at least one season of water. It occasionally pencils out on a large area. Usually it does not, and the better move is to spend the money once on the landscape you want.

A water-wise planting of ornamental grasses in gravel mulch with flagstone pavers, steel edging and a river rock channel, built in Utah by Viking Construction and Landscaping
What goes in instead of sod. On a new lot the planting decision is made once, before anything is installed, which is cheaper than making it twice.

The decision is cheaper now than later

On an established lot, converting lawn means demolition, disposal and re-plumbing the irrigation, and a rebate exists partly to offset that. On a bare lot none of that cost exists yet. You are choosing between two installs at similar cost rather than paying to undo one.

The catch is that the choice is easiest to make well before the builder's landscaping allowance has been spent on sod.

Draper Is the Exception, and It Changes the Math

Getting new construction landscaping Utah decisions right starts with one question: whose water district are you in? Draper sits in the Jordan Valley Water Conservancy District, and Jordan Valley is the one agency in the region that pays for the thing a new build is actually able to do. It calls it a new construction lawn prevention incentive, and the name is the whole argument.

The rate is $1.00 per square foot for a backyard project. An upgrade option pays $1.50 per square foot, and for that the entire lot (front, side and back) has to be landscaped to program requirements, with the two-dimensional design approved before installation. Only full backyard projects are eligible, and while there is no minimum square footage, the entire yard must meet the requirements.

Three details catch people out. Planting beds need at least 50 percent perennial and shrub coverage at maturity at ground level, and tree canopy, bulbs and annuals do not count toward it. Beds need three to four inches of mulch, unless groundcover is dense enough to cover the ground entirely at maturity. And backyard hardscape above 50 percent of the area requires written approval from the district before the project is approved at all, which is a real constraint if the plan is a large patio. Our Draper landscaping page covers the rest of the local picture, including the fact that culinary and secondary water come from two different providers there.

Your City May Decide Whether You Qualify at All

The statewide program adds a threshold that has nothing to do with your yard. The property has to sit in a municipality or county that has adopted the required water-efficient landscape ordinance, and it has to be served by a retail water provider rather than a private well. Ordinance adoption is not uniform across Utah County, so two new homes a few miles apart can get different answers to the same question.

This is a question to settle early and in writing, because it is binary. The city pages go into what each place has actually adopted, Orem, which revised its landscaping ordinance in 2020 and has no secondary system at all, Lehi, which operates under Ordinance #11-2022, and American Fork, where every connection is now metered and usage billing began with the 2025 season.

What Has to Happen Before You Get Occupancy

In Provo, landscaping is not a post-move-in project. The city's parkway code requires one tree per 25 feet of frontage on a new build, established within two years, and occupancy is withheld until the parkway is landscaped. The strip between sidewalk and curb moves onto the critical path for getting into the house.

The same code governs what can go in there: a parkway four feet wide or more needs 40 percent living vegetation within three years, rock smaller than one inch is prohibited, overhead irrigation is banned in strips under five feet, mature plant height is capped at 24 inches, and removing an existing parkway tree without the City Forester's approval is prohibited. The Provo landscaping page has the detail. If you are building elsewhere, assume nothing, this is one of the places where cities differ most.

The Builder's Grade Is Not a Finished Grade

A rough grade is set to move water off the foundation and pass inspection. It is not set to drain a patio, support planting or hold a wall. Three things are reliably true on a new lot: construction traffic has compacted the soil far beyond what roots tolerate, topsoil has often been stripped and sold off the site, and buried debris is common enough that it should be expected rather than discovered.

Utah County's published design criteria put minimum frost depth at 30 inches, or an engineer's design where conditions require deeper, and that governs footings for anything structural. Where the pad was cut into a slope you will likely need a retaining wall rather than a steeper bank, and the wall is cheaper to build before the yard is finished around it than after.

Irrigation Timing on a New Lot

Completion dates and irrigation seasons do not negotiate with each other. Lehi's pressurized irrigation season runs 15 April to 15 October, and the city requires sod in by 15 September. A house finishing in late October is outside both. Orem has no secondary system, so everything is irrigated with treated culinary water and the constraint is the bill rather than the calendar. In American Fork all connections are metered and usage billing started with the 2025 season, and Highland is moving to metered billing around 2027.

If there is any chance of claiming the switch-to-drip incentive later, the specification matters now. Converted areas need drip on their own zone, separated from overhead spray, with a dedicated and accessible filter and pressure reducer per zone, one drip type per zone, and emitters no greater than five gallons per hour. Micro-sprays, bubblers, adjustable drip emitters and soaker hoses are not permitted. Installing a system that already meets that spec costs little extra on a new build and preserves an option that is expensive to retrofit.

A Sequence That Does Not Waste Money

The order below is what new construction landscaping Utah projects follow when the incentive rules are setting the schedule rather than the builder's calendar. Most of the avoidable cost on a new lot comes from doing two of these steps in the wrong order.

  1. Design first. A two-dimensional plan is a rebate requirement in the Jordan Valley district and a cost-control tool everywhere else.
  2. Book the site visit and get written approval before anything is installed, if any incentive is in play.
  3. Fix grade and drainage while there is still access for equipment.
  4. Build the hardscape and any walls next, because both are disruptive and both set levels.
  5. Install irrigation to the specification you may want to claim against later.
  6. Plant, within the season your city's water supply actually allows.
  7. Finish the parkway to the city's rules, early if occupancy depends on it.

The one rule that overrides the order: nothing gets installed before the site visit, or the incentive is gone and cannot be recovered.

Where Hardscape Fits on a New Lot

Patios, walls and structures are easier and cheaper on a bare lot than they will ever be again, because access is open and nothing finished has to be protected. The planning constraint, in the Jordan Valley district at least, is the 50 percent hardscape threshold that triggers a written approval requirement.

For what the choices involve, see hardscaping in Utah, paver patios and the concrete versus paver comparison, along with covered patios and fire pit installation. For the planting side of a no-lawn plan, xeriscaping, water-wise landscaping and drought-tolerant plants cover what actually survives here, and park strip conversions covers the strip.

Before the sod

The cheapest moment to decide against lawn is before it is installed. After that you are paying twice and waiting for a rebate you may not qualify for.

Before the equipment leaves

Grade, drainage and walls are straightforward while the site is open and brutal once the yard is finished.

Before occupancy

In some cities the parkway has to be planted before you can move in. Find out which kind of city you are in early.

Plan the yard before the allowance is spent

We will tell you which district your address sits in, what you can and cannot claim on a new lot, and what has to be done before occupancy, before anything is installed.

Common Questions About New Construction Landscaping

What customers say

4.8 stars from 45 reviews on Google. Three of them, dated, so you can see they are current.

  • “Viking came and did our sprinklers, brought in top soil, and graded our yard in preparation for hydroseed.”
    Rosalyn P. review, May 2018
    Grading, soil and sprinklers
  • “The absolute best! We needed a complete backyard redo and new exterior of our house.”
    Matt C. review, April 2025
    Complete backyard redo
  • “The whole crew at Viking was exceptional to work with. Andreas knows what he’s doing and build a top notch product.”
    Ben B. review, December 2020
    Full build

Read all 45 reviews on Google

Recent work

Projects built by our own crews across Utah County and the Wasatch Front.

  • A hillside backyard at sunset with a pool and spa, a concrete pool deck and terraced block retaining walls, built in Utah by Viking Construction and Landscaping
  • A covered patio under a heavy timber beam structure, with stacked stone seat walls, a poured concrete slab and wood steps, built in Utah by Viking Construction and Landscaping
  • A concrete patio with a segmental block seat wall and a gas fire pit on a Utah hillside lot, built in Utah by Viking Construction and Landscaping
  • A landscape and outdoor construction project in Utah by Viking Construction and Landscaping
  • A landscape and outdoor construction project in Utah by Viking Construction and Landscaping
  • A landscape and outdoor construction project in Utah by Viking Construction and Landscaping
@built_by_vikings

New projects go up here first.

Follow on Instagram

Can I get the lawn replacement rebate on a brand-new home?

No, and this is the single most expensive surprise on a new lot. Every lawn-removal incentive in this part of Utah requires living lawn already in the ground. The Central Utah Water Conservancy District program, which covers Utah County, states that you “must have existing well-maintained, living lawn in the project area at initial site visit.” The statewide Division of Water Resources program states that the “project area must be currently landscaped with a living, maintained lawn.” A bare builder lot has no lawn, so it satisfies neither. Rebate terms do change, so confirm the current rules for your address before you plan around them.

Why do the rebates require existing lawn at all?

Because they are water-savings programs, not landscaping grants. The district is buying a measurable reduction in outdoor water use, and it can only measure that against lawn that is currently being irrigated. Removing 1,000 square feet of established, watered bluegrass produces a documented saving. Choosing not to install 1,000 square feet of lawn on a lot that never had any produces exactly the same outcome in reality, but nothing the program can verify against a baseline. That is the logic, and it is why the Jordan Valley district had to create a separate product to reward it.

Is it worth installing sod just to remove it later for the rebate?

Almost never, and running the arithmetic is worth doing before you dismiss it. You would pay to install sod, pay to water and maintain it well enough that it is “well-maintained, living lawn” at the site visit, wait, then pay to remove it, in order to collect $3.00 per square foot. Against that you have the install cost, the removal cost, and one or more seasons of culinary or secondary water on grass you never wanted. The programs also require pre-approval and a site visit before any work starts, with projects started or completed before that approval ineligible, so the sequencing has to be deliberate rather than opportunistic. In most cases the money is better spent once, on the landscape you actually want.

What is the new construction option in Draper?

Draper sits in the Jordan Valley Water Conservancy District, which does offer what it calls a new construction lawn prevention incentive, the only path in the region that pays you for never installing lawn rather than for taking it out. The rate is $1.00 per square foot for a backyard project. There is also an upgrade option at $1.50 per square foot, which requires that the entire lot, front and side and back, is landscaped to program requirements. Utah County is in a different district with no equivalent, which is why the right answer on a new lot in Draper is not the right answer on a new lot in Lehi.

Does the whole yard have to be done to get the new construction incentive?

For the Jordan Valley new construction incentive, yes in the sense that matters. The program states that only full backyard projects are eligible, and that while there is no minimum square footage requirement, the entire yard must meet program requirements. You cannot do a qualifying strip and leave the rest as weeds. The upgrade option goes further and takes in the whole lot. Planting beds need at least 50 percent perennial and shrub coverage at maturity measured at ground level, with tree canopy, bulbs and annuals excluded from that calculation, and beds need three to four inches of mulch unless groundcover is planted densely enough to cover the ground completely at maturity.

Do I need a landscape design before I can apply?

For the new construction incentive, yes. The Jordan Valley program requires a two-dimensional landscape design, and under the upgrade option that design has to be approved before installation begins. This inverts the usual order of operations on a new build, where landscaping tends to be whatever gets done after the house is finished and the budget is nearly spent. If there is a rebate in play, the drawing comes first and the approval comes before the equipment arrives.

Can I start grading before the site visit?

Not if you want the incentive. The programs are explicit that a site visit and approval to proceed are required before work starts, and that projects started or completed before that approval are ineligible. There is no retroactive application and no allowance for having already begun. On a new build this is easy to get wrong, because the builder's crew may be moving dirt on a schedule that has nothing to do with your rebate application. Get the visit booked before anyone touches the yard.

Does my city affect whether I qualify for the state program?

It can. The statewide Division of Water Resources program requires that the property sits in a municipality or county that has adopted the required water-efficient landscape ordinance, and that it is served by a retail water provider rather than a private well. Ordinance adoption is not uniform across Utah County, so two new homes a few miles apart can get different answers. It is worth confirming for your specific address rather than assuming, because this one is a threshold question and not a detail.

When does the parkway have to be planted on a new build?

In Provo, before you get occupancy. The city's parkway code requires one tree per 25 feet of frontage on a new build, to be established within two years, and occupancy is withheld until the parkway is landscaped. That turns the strip between sidewalk and curb from a finishing touch into a item on the critical path for moving in. Other cities handle it differently, so check the one you are building in.

Is the builder's grade good enough to plant on?

Usually not, and treating it as a finished grade is how drainage problems get locked in. A builder's rough grade is set to get water away from the foundation and pass inspection, not to support planting or hold a patio flat. Construction traffic compacts the soil heavily, topsoil is frequently stripped off the lot, and buried offcuts and chunks of concrete are common. Utah County's design criteria put minimum frost depth at 30 inches, or an engineer's design if conditions require deeper, which governs footings for anything structural you build on that ground.

What happens if my house finishes in October?

You may have no irrigation water available, depending on the city. Lehi's pressurized irrigation season runs from 15 April to 15 October under Ordinance #11-2022, and the city requires sod to be installed by 15 September. A house that completes in late October in Lehi is on the wrong side of both dates, which in practice means planting waits for spring rather than going in late and failing over winter. Orem has no secondary system at all and irrigates on treated culinary water year-round, so the constraint there is cost rather than season. The honest answer is that a late completion often means a spring install, and planning for that beats forcing it.

Viking Construction & Landscaping

New construction landscape design, grading, hardscaping and irrigation across Utah County and the Wasatch Front

(385) 233-5524