A hillside backyard at sunset with a pool and spa, a concrete pool deck, a linear gas fire pit and terraced block retaining walls, built in Utah by Viking Construction and Landscaping
We build both · Utah County

Concrete vs Paver Patio

4.8 from 45 reviewsRead them

An honest comparison for a 30-inch frost line and severe freeze-thaw, including when concrete is the better answer. Serving Utah County and the Wasatch Front.

  • Over 20 years in business
  • Parade of Homes People’s Choice
  • 4.8 from 45 Google reviews
  • Free estimates, no obligation
  • Based in Lindon, Utah
10 ftJoint Spacing, 4" Slab
6%Air For Freeze-Thaw
0De-icer, First Winter
8,000PSI Paver Standard

We install both, so there is no answer we are trying to sell you here. The materials fail differently, cost differently over time, and suit different ground: and in Utah, the ground and the winter do most of the deciding.

This page covers the concrete vs paver patio Utah decision honestly: what each material does under freeze-thaw, what the published standards actually require of each, how they behave when something goes wrong, and the cases where concrete is plainly the right call.

Concrete Will Crack. That Is Not a Defect.

“Cracks in concrete cannot be prevented entirely, but they can be controlled and minimized by properly designed joints.” That is the industry's own position, not a disclaimer we invented. Concrete shrinks as it cures; restrained shrinkage cracks.

Control joints do not prevent cracking. They decide where it happens, so the crack forms in a clean tooled or saw-cut line rather than wandering across the middle of your patio. Which makes the jointing specification worth checking:

Spacing should be a maximum of 24 to 36 times the slab thickness: roughly ten feet on a four-inch slab, with fifteen feet a recommended ceiling regardless. Depth must be at least a quarter of the slab thickness and never less than one inch; a joint cut too shallow does not control anything. Timing is the one most often missed: conventional saw cuts within four to twelve hours of finishing, early-entry dry cuts typically one to four hours. Cut too late and the slab has already cracked where it wanted to.

Isolation joints are separate and also necessary, keeping the slab free of walls, footings and columns so each can move independently.

Anyone promising a crack-free slab is promising something the material does not do.

What Utah Winters Demand of Each

RequirementPoured concretePavers
Freeze-thaw provisionAir entrainment, 6% total air for 3/4 in. or 1 in. aggregateASTM C936, includes freeze-thaw and de-icer criteria
Strength / absorptionDepends on mix and placement on the day8,000 psi min. average, ≤5% average absorption
De-icer, first winterAvoid entirely. Use clean sand for tractionRock salt acceptable; avoid magnesium chloride and CMA
De-icer, afterwardsModerate amounts only; excess causes scalingRock salt preferred, applied sparingly
Response to ground movementRigid, resolves movement by crackingFlexible, absorbs small movement
Curing / usableMust be cured properly; keep off itUsable the day the section is compacted
Ongoing maintenanceLittle, until a crack or scaling appearsJoint sand topped up; inspect spring and fall
Repairing damagePatches are visible; failed sections get broken outLift and reset individual units, effectively invisible
Utility access laterSaw cut and patchLift, work, reinstate
Concrete figures from published ready-mixed concrete industry guidance; paver figures from published interlocking concrete pavement guidance.

The de-icer row is worth pausing on because it catches people in their first season. A new concrete patio wants no chemical de-icer at all through its first winter, sand for grip and nothing else. Excessive application, especially on new concrete, is a named cause of scaling, the flaking surface failure visible on plenty of older Utah driveways.

Scaling has other listed causes worth knowing, because they are all workmanship: too little entrained air at the surface, low-strength concrete, finishing while bleed water is still present, overworking the surface (which drives the entrained air out of exactly the layer that needs it), using a steel trowel on exterior flatwork, and insufficient curing.

A timber pergola over a concrete patio with stone seat walls, a fire pit and paver steps, built in Utah by Viking Construction and Landscaping
Concrete field, paver steps and banding, stone walls. Choosing one material for the whole yard is rarely the right answer.

It Is Not Actually One Or The Other

The question gets framed as a choice because that is how quotes are structured, but the strongest builds usually use both. A poured field handles the large open area where a continuous surface is the point. Pavers take the steps, the borders and the level changes, which is exactly where a slab is most likely to crack and hardest to repair.

It also solves a real aesthetic problem. A large unbroken slab reads as a lot of grey, and the joints you need in it anyway are more attractive when they line up with a banding course than when they are simply saw cuts across the middle.

When Concrete Is the Better Choice

Large continuous areas

Where an uninterrupted surface is the point (a pool deck, a sport area, a wide modern terrace) concrete does something pavers cannot. Plenty of the best work we photograph is poured, for exactly this reason.

Wheels

Strollers, wheelchairs, scooters, a basketball. A continuous troweled surface is simply better than a jointed one, and the difference is noticeable to anyone who uses it daily.

Simplest snow clearing

No joints and no unit edges for a blade to catch, and no risk of lifting a unit. Shoveling a slab is faster and more forgiving.

A specific look

Large-format, minimal, monolithic. If that is the design, pavers are the wrong material and no amount of pattern work will produce it.

Lower up-front budget

Generally less to install for the same area. If the budget decides whether the project happens at all, that matters more than a theoretical thirty-year comparison.

Stable, well-drained ground

Where the subgrade is sound and water is genuinely controlled, the main argument for a flexible system is weaker.

When Pavers Are the Better Choice

Ground that moves

Heavy clay, fill, a reworked grade, anywhere frost movement is likely. A flexible system shifts slightly and survives what cracks a slab.

Anything buried underneath

Irrigation, gas, electrical, pool plumbing, drainage. Pavers come up and go back invisibly; a slab gets cut and patched.

Long time horizon

Over decades the repairable surface wins, because damage stays local and fixable rather than accumulating as visible patching.

Steps, borders and level changes

The places a slab is most likely to crack and hardest to repair neatly.

Immediate use

No cure time. The section is finished when it is compacted.

Curves, color and pattern

Complex shapes and material variation are native to a unit paving system and awkward in a slab.

Questions That Settle It

1. What is under it?

If anything will ever need digging up, pavers. If it is clean subgrade with nothing buried, that argument disappears.

2. What is the soil doing?

Heavy clay, fill or a reworked grade favors a flexible surface. Stable, well-drained ground does not.

3. How long do you expect to be there?

Short horizon favors lower up-front cost. Long horizon favors repairability.

4. Who uses it, and how?

Wheels and a continuous surface point to concrete. Pattern, curves and level changes point to pavers.

5. Who clears the snow?

A slab is more forgiving to plow and shovel. A paver field needs diagonal clearing and the right de-icer.

6. Can you use both?

Usually yes, and usually the best outcome: poured field, paver edges and steps.

Concrete vs Paver Patio Utah FAQs

What customers say

4.8 stars from 45 reviews on Google. Three of them, dated, so you can see they are current.

  • “Viking Construction and Landscaping did a complete patio and lawn makeover for our home.”
    Brittney W. review, April 2023
    Patio and lawn
  • “They recently fully landscaped my home and included a fire pit and an in-ground tramp.”
    Christopher M. review, April 2019
    Full landscape and fire pit
  • “We love our deck and patio. Andreas and his team were very meticulous in making sure everything was perfect and exceeded our expectations! High quality workmanship”
    Michelle S. review, December 2021
    Deck and patio

Read all 45 reviews on Google

Recent work

Projects built by our own crews across Utah County and the Wasatch Front.

  • A covered patio under a heavy timber beam structure, with stacked stone seat walls, a poured concrete slab and wood steps, built in Utah by Viking Construction and Landscaping
  • A poured concrete patio with a capped block retaining wall, a raised planter bed of young arborvitae and a hot tub, built in Utah by Viking Construction and Landscaping
  • A concrete patio with a segmental block seat wall and a gas fire pit on a Utah hillside lot, built in Utah by Viking Construction and Landscaping
  • A landscape and outdoor construction project in Utah by Viking Construction and Landscaping
  • A landscape and outdoor construction project in Utah by Viking Construction and Landscaping
  • A landscape and outdoor construction project in Utah by Viking Construction and Landscaping
@built_by_vikings

New projects go up here first.

Follow on Instagram

Which is cheaper, concrete or pavers?

Concrete is generally lower to install and pavers generally cost more up front, and anyone who quotes you a per-square-foot figure without seeing the site is guessing, because excavation, access, grade and what is already in the ground move the number more than the surface material does. The more useful comparison is over time. Concrete's repair cost is low until it cracks badly or scales, at which point the fix is visible or the section is replaced. Pavers cost more at the start and then have a small recurring cost in joint sand and the occasional reset, but individual damage is repairable without a visible patch. Which is cheaper depends entirely on the time horizon you are pricing.

Will my concrete patio crack?

Yes, and industry guidance says so plainly: cracks in concrete cannot be prevented entirely, but they can be controlled and minimized by properly designed joints. Concrete shrinks as it cures, and when that shrinkage is restrained it cracks. The purpose of control joints is not to stop cracking but to decide where it happens, so that it occurs in a straight tooled line instead of across the middle of the slab. A contractor who promises you a crack-free patio is promising something the material does not do. What they can promise is correct jointing.

How far apart should control joints be?

Maximum joint spacing should be 24 to 36 times the thickness of the slab, which for a four-inch slab works out to about ten feet, with a recommended maximum of fifteen feet regardless. The groove has to be cut at least a quarter of the slab's depth and never less than one inch. Timing matters as much as spacing: conventional saw cuts should be made within four to twelve hours of finishing, and early-entry dry cuts typically one to four hours after. Leave the cutting too late and uncontrolled cracking happens first, which defeats the whole exercise.

Does concrete need to be air-entrained in Utah?

Yes. Provo's design criteria classify the local weathering exposure as severe, which is a statement about freeze-thaw cycling, and industry guidance for concrete exposed to freezing and thawing is unambiguous that concrete should be air-entrained, with a total air content of 6 percent for mixes using three-quarter-inch or one-inch coarse aggregate. Entrained air gives the water somewhere to expand into when it freezes. Non-air-entrained concrete, or concrete with too little air at the surface, is one of the listed causes of scaling, which is the flaking surface failure you see on older Utah driveways.

Can I use ice melt on a new concrete patio?

Not in the first winter. Industry guidance is to avoid de-icing chemicals in the first winter entirely and to use them in moderate amounts after that, because excessive application increases the potential for scaling and new concrete is at its most vulnerable. The recommended alternative on new concrete is clean sand for traction. This is a genuine practical difference between the two surfaces: a new paver patio can take rock salt from day one, provided you avoid magnesium chloride and CMA, while a new concrete patio wants nothing at all for its first season.

Which holds up better to Utah freeze-thaw?

Both can do well, and both have a specification that determines whether they do. Pavers are manufactured to ASTM C936, which sets a minimum average compressive strength of 8,000 psi and average absorption no greater than 5 percent, and includes freeze-thaw durability and de-icer resistance criteria. Concrete depends on the mix and the workmanship on the day: air entrainment, adequate strength, proper curing and finishing that does not bring bleed water to the surface or overwork it. The structural difference is movement. A paver field is a flexible system that tolerates small ground movements by shifting slightly, where a slab is rigid and resolves the same movement by cracking.

Which is easier to repair?

Pavers, and it is not close. A damaged unit is lifted with an extractor, replaced, compacted and the joints refilled, finishing no more than an eighth of an inch high. Done properly it is invisible, especially if spare units are spread through the pattern rather than grouped. A cracked slab has no equivalent. Fillers and sealants are visible, resurfacing is a maintenance item rather than a fix, and a genuinely failed section comes out with a breaker. If something under the patio will ever need digging up, that difference is the whole decision.

Can pavers be laid over an existing concrete slab?

Sometimes, and it is worth asking about before demolishing a slab that is structurally sound. The conditions are that the slab is stable rather than actively moving, that water has somewhere to go rather than being trapped between slab and pavers, and that raising the finished surface by the thickness of the pavers and bedding does not create a problem at door thresholds, steps or against the house. Where those conditions are not met, the slab comes out. It is a site judgement rather than a rule, and it is the kind of thing worth having looked at rather than assumed either way.

How soon can each one be used?

A paver patio is usable as soon as the joints are filled and the final compaction is done, which is the same day that section is finished. Concrete has to cure, and curing is not optional: industry guidance recommends either a pigmented liquid membrane curing compound or covering the slab with wet burlap and plastic sheeting to hold moisture and temperature, because insufficient curing leaves a weak surface that scales later. Practically that means keeping off it, and a contractor who is in a hurry at the curing stage is building in a future failure.

Which is better around a pool?

Both are used, and the deciding factors are usually movement, slip and repair access rather than looks. A large continuous concrete deck gives a clean uninterrupted surface and is simple to keep clear, which is why a lot of high-end pool decks are poured. Against that, pool surrounds carry plumbing and equipment runs that occasionally need access, and they frequently sit on fill or on reworked grade that may settle, both of which favor a surface that can be lifted and reinstated. Drainage away from the pool matters more than the material either way.

Can I use both?

Yes, and it is often the best answer rather than a compromise. A poured field with paver banding, paver steps or a paver border is a common and durable combination: the concrete gives the large continuous surface, the pavers take the edges and the level changes where a slab is most likely to crack and hardest to repair. Mixing materials also breaks up a large expanse visually, which a big slab needs. Several of our own builds do exactly this.

We will tell you when concrete is the right answer

The concrete vs paver patio Utah decision comes down to ground, use and time horizon, and it is answered on site rather than from a brochure. We install both and have no reason to steer you.

Related: paver patios in Utah for the paver specification in detail, hardscaping in Utah for the base and drainage both surfaces sit on, and retaining walls where there is a grade change involved.

Viking Construction & Landscaping

Concrete and paver patios across Utah County and the Wasatch Front

(385) 233-5524